← Robot database

Figure 03 vs Optimus V3 (Gen 3)

Figure AI Figure 03 and Tesla Optimus V3 (Gen 3) compared on the same basis. Each value shows how sure we are of it, so a reported figure is not read as an official one.

ItemFigure 03Optimus V3 (Gen 3)
CompanyFigure AITesla
StageProductionProduction
Height cm173 Official173 Reported
Weight kg61 Official57 Reported
Total degrees of freedom30 Reported28 Reported
ActuationElectric OfficialElectric Official
Top speed km/h4.3 Official—
Hand DoF (per hand)—22 Reported
Fingers5 Reported—
Payload kg20 Official20 Reported
Tactile sensorsFingertip sensors detect force down to about 3g, cameras in both palms Official—
Runtime h5 Official—
Battery kWh2.3 Official2.3 Official
Battery swapFixed (not swappable), 2kW wireless inductive charging and docking through foot coils Official—
Compute unit2 onboard low-power embedded GPUs (run Helix) OfficialTesla AI4 (FSD computer) family, AI5 planned Reported
SensorsNext-generation cameras (2x frame rate, 1/4 latency, 60%+ wider view), cameras in both palms, fingertip tactile sensors that detect 3g, 10Gbps mmWave data offload OfficialAutopilot/FSD-family vision cameras, hand tactile sensors (patent) Reported
AI modelHelix (own VLA model) → Helix 02 (2026-01, single neural network from pixels to whole-body action) → Helix 2.5 (2026-09, pretrained on the human behavior dataset Index, zero-shot generalization in 30 unseen homes) OfficialEnd-to-end neural network shared with Tesla FSD Reported
Price$130,000 Rumor$25,000 Rumor
Production & shipmentsBotQ phase 1 at 12,000 units/year, target of 100,000 units over 4 years. 2026-04: one unit per hour, 350+ Figure 03 delivered (official). 2026-05 commercial logistics contract with Catalyst Brands, 2026-06 deployed in BMW Spartanburg Hall 52 OfficialQ3 results 2026-10-22: 'initial production' started on the Fremont high-speed line, most equipment for 1 million units/year per line moved in, at least 1+ year to reach the target annualized rate. Construction of the Austin Optimus factory started (long-term plan of 10 million units/year for the Giga Texas second-generation line). External customer deliveries around the end of 2027 (early industrial use) Official

Other comparisons